Wind turbine for Cretel

As a CO2-neutral building, our location in the port of Ghent is already a real gem. As the icing on the cake, our parent company Luminus is currently constructing a wind turbine there. Once operational, this wind turbine will produce 13,000 MWh of green energy per year, which is equivalent to an annual saving of 3,700 tonnes of CO2. In this way, we are happy to contribute to the transition to green energy.

Recently, a group of colleagues was able to visit the site together with employees of the neighbouring Castrol company. As you can see in the photos, the scale of the components is quite impressive. The construction is running smoothly: works on the upper part of the turbine have recently started.